Museum Signage Systems
* The strongest track system for Hanging Artworks
* Track can be built into the wall at construction phase
* Our most discreet track system - aperture of just 5/16"
* Buy Six Tracks with FREE Shipping HERE
* Choosing Hardware PDF
* Flush Track Spec Sheet
The hanging track range is ideal for environments where the works of art are changed frequently.
This is our most robust track. With the correct installation it will carry loads of half a ton. At the same time, it is also our most discreet track, with a narrow slot of just 5/16" visible when the track is installed. The Flush Mounted Track has been designed for installation during the construction phase and will blend seamlessly with the building structure to provide a readily accessible fixing, enabling artworks to be hung at any point and any height. Artworks can then be hung using a variety of materials including stainless cable or stainless rod. We have found this extrusion to be of particular interest to architects and designers as it is easy to install during construction and provides a flexible system with a very low visual profile.
**The GL series of hooks and hangers will only work with the stainless steel cable.
**Each cable or rod requires a top block.***Screws not included due to different use scenarios***
FLUSH MOUNT TRACK:
USEFUL TIPS AND GUIDELINES
For the best result we recommend installation during the construction phase of your project. After fixing, most of the track is then covered by the drywall cladding, meaning that the Flush Mount Track becomes a seamless element of the building.
INSTALLATION INSTRUCTIONS
The track comes ready to drill at the appropriate intervals. Refer to the "Flush track spec sheet" if in doubt. Repeat this process for the second section after inserting one 5/64 roll pin halfway into the 0.08 opening at the end of the track and use this pin to engage with the next section. This will ensure all the tracks align beautifully.This track is the strongest discreet track on the market. If you intend to hang very heavy works (in excess of 250 lbs) then we recommend drilling additional holes along the top edge.
When the track is installed, 1/2" or 5/8" drywall is applied over the top of the fixing flanges so that only the core of the track remains visible. The drywall can then be skimmed where required and the extrusion has a small ‘tooth’ to the edge of the lip to aid the application of a skim coat. We recommend applying a strip of 1/2" masking tape to the face of the track for protection during this process.
Hanging your Artworks:
With stainless cable, feed the cord through the top block and ‘hook’ it into the track.
With stainless rods, hook the top block into the track and screw the rods into place from beneath.
Slide the appropriate barrel up the cord or rod from the bottom and tighten at the required height with the bolt heads facing toward you. It’s much easier to do this with the two lengths side by side so that the barrel heights match.
For artworks with cord on the back, just place the cord over the hook.
With the rods at the correct distance apart, the artwork is lifted into place so that the protruding Hanging Hook can catch on the D-ring or other appropriate hanging hardware.
http://museumhangingsystems.net
http://museumdisplay.com